The roof was completely framed last week, with just a few small details left for this week. Also, a lot of the exterior plywood sheeting has been installed. The house is really taking shape. It is thrilling to walk around and see the views from each of the windows. The views from the 3rd floor windows and deck are dramatic and the two huge windows on the 2nd floor provide a panoramic view of the foothills, downtown Golden, and Clear Creek canyon.