The sheetrock was delivered on Wednesday, all 400 sheets. That's right, they loaded it into the house through the windows. It adds at least 20,000 lbs to the house. Our contractor will wait until all the sheetrock is hung before applying the final finish coat of stucco. All that additional weight causes normal cracking in the stucco base layer. The drywall crew started hanging the sheetrock on Thursday. As they move
through the house, we can see the final size of each room.